As Per Deliverables Stage 1 Indicated At Scc , Receipt Ofnew Lars From Niot Oem And Safe Storage At Shipyardpremises As Specified In The Scope Of Work, Stage 2 Point F ,Removal Of The Existing A Frame Onboard Ship Incl. Of Twohyd.Cylinders, Pistons, Foundation And Existing Deep Seawinch. Handing Over The Two Items To Niot Nominatedcontractor With Full Docs , Modification Of Ship Structure Andother Systems Along With Cabling, Piping And Necessarypower Points As Mentioned In The Proposed Modificationreport Approved By Both Class Irs And Dnv In Dry Dock ,Completion Of Intgr Of Lars By Successfully Completing Ofinst Comm And Hat Of New Lars Onboard Ship Alongwithoem Necessary Support For Sat Will Be Carried Out By Niotand Oem , Cost For Per Kg Steel Weight Renewal In Case Ofadditional Repair Work With Maximum Additional Steel Workbe Limited To 5 Tons , All Risk Insurance For New Lars Andfrom Date Of Receipt At Shipyard Till Successful Completion Ofhat And Sat All Risk Insurance For The Ship, People, Niotproperty During Drydock Period As Per Nit Quantity: 7