Supply & Installation Of Aerosol Fire Detection And Suppression System Cartridge 30 Gm + 1 00 Gm , Total 2 Pieces Asper Technical Requirement Specified In Annexure-G1 Of Rdso Specification No-Rd So/Pe/Spec/Ac/0192-2018 (Rev-1) With Modified Action Temperature Setting As (68 -72)0C , As Per Rdso Le Tter No -El./7.1.108/Sbc/Main Dtd. 06.08.2025 This Shall Be Installed In The Switch Board Cabinet Of Various Types Of Non-Ac Lhb Coaches. All Necessary Modification, Clamping Arrangement And Accessories Required For Installation Of This Item Shall Be With The Scope Of The Supplier. Note: Location Of Installation Of Aerosol F Ire Cartridge In The Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No- El/7.1.108/Sbc/Main Dt.0 7.01.2022. [ Warranty Period: 30 Months After The Date Of Delivery ] ]