Upgrading The Four (4) Existing Book Sorting And Packaging Conveyors Within The Contracting Authority'S Warehouse In Order To Improve The Speed, Sorting Accuracy And Operational Efficiency To Be Able To Support The Increased Packaging Needs That Will Arise With The Implementation Of The Multiple Book Institution. A Turnkey Technical Solution Is Required, Fully Compatible With The Existing Conveyors. In Particular, The Upgrade For Each Of The Four Conveyor Belts Includes The Supply/Construction, Installation, Interconnection, Parameterization/Programming And Commissioning Of The Following Subsystems: (A) Doubling Of Operating Speed, (B) Dual Separation Accelerator, (C) Qr Scanner Camera System For Identification And Traceability, (D) Darb Sorter For Automatic Routing Of Products, (E) Arb (Activated Roller) Systems Belt) For Directed Movement Of Products, (F) Ball Belt Conveyor For Optimizing The Process Of Sorting, Diverting Or Accumulating Book Packages And Individual Pieces At The End Of The Conveyor Belt, (G) Interface With The Software Of The Installed Wms, (H) Plc For Central Control Of The Overall System, (I) Other Equipment (Electrical, Safety, Etc.). The Total Budget Of The Contract Being Auctioned Here (For The Four (4) Conveyor Belts That Are Its Object) Amounts To €600,000.00 (Six Hundred Thousand Euros) Plus The Corresponding Vat Which Is Borne By I.T.Y.E. It Is Mentioned That The Applicable Vat Rate At The Time Of The Publication Of This Declaration It Is 24% And Based On This Rate All The Relevant Calculations Have Been Made, Where Required In This Declaration. The Total Amount Of The Relevant Vat Amounts To €144,000.00, I.E. The Total Expenditure Amounts To €744,000.00 Including Vat. It Is Clarified That In The Total Budget Of €600,000.00 Plus Vat. Included: Amount €560,000.00 Plus Vat. For The Implementation Of The Project In Accordance With The Specifications Of The Declaration And The Financial Offer Of The Contractor. An Offer Exceeding The Above Amount Will Be Rejected. Amount €40,000.00 Plus Vat. For Additional Equipment Or Services That May Be Required During The Implementation Of The Technical Solution That Will Ultimately Result From The Application Study And Cannot Be Determined In Full In Advance (Crawler For Transporting Longer Palletizing Costs, Additional Training Hours, Etc.). Equipment And Services In This Category Will Be Priced Based On The Contractor'S Economic Offer Prices, With A Corresponding Extension Of The Contractual Object. Total Implementation Time Of The Contractor'S Project: 6 (7) Months From The Signing Of The Contract. Within This Time, The Successful Test Operation Of The System And The Last Conveyor Belt Should Be Completed. In The Event That The Installation And Test Operation Is Chosen To Be Done Serially, Then This Time Is Increased By One (1) Month.