Fabrication And Construction Of 30" Od High Pressure Overhead Piping Connection Between Existing 36" Od Inlet Header To 30" Od Outlet Header And Related Works At Elenga Compressor Station, Tangail On Installation, Testing, Hook Up & Commissioning Basis.