Retention Tank For Lhb Ac Ra Coaches (Without Flushing Arrangement). Stic Ker For Bio-Tank To Drg. No. Icf/Std-6-4-048 Alt B Item 1 Is In The Scope Of Supplier As Per Spec Mdts 26001 Rev-04. Note: Safety Clause Must Be Followed According To Annexure-A Of Dy.Cple-Ii L.No.Rcf/Emp/1 Dated. 01.04.2025 And Use High Tensile Fasteners For Critical Application As Per Design L.No. Md46111 Dated 06/08/2025, As Per Drawing: Ra63247 Alt B Wit Hout Item No. 3 To 6 And Mdts 26001 Rev-04 Is Applicable (Flushing Arrangement To Claus E 3.5 Is Not In Scope Of Supply), Installation & Commissioning: Inclusive, Packing Instruction No. Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]