Package No. 2: Construction To Serve Urgent Traffic Road Surface With Severe Damage After Prolonged Rain (November 18 ÷ November 23, 2025) Section Km1337+1650 - Km1338+00 (T+P); Km1338+00 - Km1339+00 (T); Km1339+100 - Km1339+500 (P); Km1339+500 - Km1340+00 (T+P); Km1341+00 – Km1341+700 (T); Repair And Strengthen The Traffic Safety System To Ensure Qcvn41:2024/Bgtvt Section Km1337+1650 - Km1341+700 National Highway 1, Dak Lak Province