: Assistance, Monitoring And Control Of Market N° 01/Sa/2025 Relating To The Development Work Of The Following Tracks: • Track 1: The Track Linking Route Magarto Towards Oulad Ben Mokhtare Passing Through Laaouina (0.340 Km) • Track 2: The Track Linking Route Magarto Towards Elharcha Ziow.(1,400 Km) • Track 3: The Track Linking Route Magarto To Marss Ziow (0,830 Km) • Track 4: The Track Linking Route Magarto Passing Through El Haj Kabir To Gaada (2,000 Km) • Track 5: The Track Linking Route Magarto To Rn 23 Opposite Ziow Water Towers. (0.830Km) • Track 6: The Track Connecting Rn 23 Passing Through Oulad Chikh Mekki Towards Douar Bourara (1.955 Km) To The Commune Sidi Abdelkrim