Package 11.Hb.25: Construction Of Repair Items, Construction Of Embankment To Prevent Landslides At Location 228; Repair Damaged Embankment Foundation At Position 240, Line 580 Son La (T500Sl) - 574 Hoa Binh (T500Hb)