Mobilsation Of Plants And Equipment Including Men Andmaterials As Required At Site Of Soil Investigation Setting Orboring Drilling , Shifting Of Man Materials And Equipmentsfrom One Bore To Another Bore Location Including Setting Ofboring Drilling As Required An Das Directed By Engr In Charge, Boring 150Mm Dia Boreholes To A Depth Of 10M To 20Mthrough Type Of Strata Any Type Of Soil , Boring 150Mm Diaboreholes To A Depth Of 10M To 20M Through Type Of Stratasoft Rock , Boring 150Mm Dia Boreholes To A Depth Of 10Mto 20M Through Type Of Strata Hard Rock , Collection Ofundisturbed Soil Saples At Every 3M Interval Or Any Changeof Strata In 100 Mm Bore Thin Walled Tube Incl Waxingsealling And Packing Transporting To The Lab , Carrying Outstandard Penetration Test Spt As Per Is 2131 Including Noscollection Of Disturbed Soil Samples In Bore Holes At Every 1Mtr Depth , Excavation Of Trial Pit Upto 3 Mtr Depth Haingsize 1 Point 20 X 1 Point 20M For Nos Collecting Uds Sampleincluding The Following Tests , Conducting Necessary Test Onall Collected Samples Of Each Bore Hole Which Includes Thedetermination Of , Submission Of Report In 06 Copiesincluding Bore Log Laboratory Result Ls Recommendation Andtype Of Foundation Quantity: 95