Retention Tank For Lhb Slr Hog Coaches (Without Flushing Arrangement). S Ticker For Bio-Tank To Drg. No. Icf/Std-6-4-048 Alt B Item 1 Is In The Scope Of Supplier As P Er Spec Mdts 26001 Rev-04. Note: Safety Clause Must Be Followed According To Annexure-A Of Dy.Cple-Ii L.No.Rcf/Emp/1 Dated. 01.04.2025, As Per Drawing: Mi007539 Alt Nil A Nd Mdts 26001 Rev-04 Is Applicable (Flushing Arrgt. To Clause 3.5 Not In Scope Of Supply), Installation & Commissioning: Inclusive, Packing Instruction No.Pi100 Ver1.0. [ Warranty Peri Od: 84 Months After The Date Of Delivery ] ]