Package 10: Supply, Construction And Installation Of Vttb (Section 2: From Location G3 To 220Kv Phuoc Dong Substation And Section 3: From 2-Circuit Branch Pole At Location G7 To 110Kv Phuoc Dong 6 Station) Project: New Construction Of Wire Line Connecting 110Kv Station Phuoc Dong 5&6 (220Kv Tay Ninh 2) - 220Kv Phuoc East, 2 Circuits