The Purpose Of The Consultation Is To Conclude A Framework Agreement For Dredging On The Large-Scale Network Of The Coherent Hydrographic Units (Uhc) N°1 To 3 (Lot 1) And On The Small-Scale Network Of The Nord Pas-De-Calais Territorial Directorate (Lot 2) Of Voies Navigables De France.