Preparation Of A Feasibility Study (Together With Cba) Together With A Report On The Environmental Impact Of The Project, A Report On The Disposal Of Excavated Material Into The Sea And Auxiliary Studies For The Investment Entitled "Conducting Works To Enable Water Transport To The Outer Port In Świnoujście."