Execution Of P.Way Works 1) Complete Track Renewal (Primary) Of Existing 60 Kg 90 Uts Rail On 60Kg Psc-14 Sleeper With New 60 Kg 90 Uts Rails On 60Kg Wide Based Sleepers For A Length Of 0.773 Tkm From Km.1.217 To Km.1.99 Uni Line Between Vskp-Ncc Under Aden/Myd/Wat,2) Through Sleeper Renewal (Primary) Of Existing Psc 60 Kg Sleepers With New Wide Based 60 Kg Sleepers Along With Deep Screening And Raising Of Ballast Cushion For A Length Of 2.837 Tkm Scmn-Gpt (By-Pass) From Km.0 To 1.322- Dn Line & Km.1.217 To Km.1.99 Uni Line Between Vskp-Ncc Under Aden/Track/Wat.3) Through Turnout Renewal Ttr(Cs+Cmsc)-10 Sets Under Aden/Myd On Wmy Line.4) Through Turnout Renewal -25 Sets - Ttr(Cs)-11 Sets & Ttr(Cmsc)-14 Sets In Various Sections Of Waltair Division 5) Through Turnout Renewal Ttr(Tfr)-39 Sets (1 In 12-6 Sets And 1 In 8% 33 Sets) Under Sr.Den/South/Wat.