Jp Div-Electrical Work In C/W Provision Of Fob To Connect Both Pfs At Dabla (Dbla) Station. Raising The Level Of Pf No. 1 & 2 From Medium Level To High Level And Extension Of Lengths Of Pf No. 1 & Pf No. 2 To 600 Meters With Provision Of Fob To Connect Both Pfs At Kanwat (Kawt) Station, Extension Of Length Of Pf No. -1 & 2 To 600 Meters At Shri Madhopur (Smpr) Station Raising The Level Of Pf To High Level At Kachera (Khra), Baga, Mada, Jllo, Apj & Kmnp Stations.