Supply, Testing And Commissioning (Including All Connections & Dressing Without Loadin G), Set Of Roof Mounting Ac Package Units (Rmpu) Type-I For Lhb Eog Coaches (Coach-Sets) Cons Isting Of Rmpu (With R407 C Refrigerant)-02 Nos And Microprocessor Controller Unit-01 No Complete W Ith Accessories As Per Scope Of Supply As Envisaged In Rdso Specification, Without Bellow Ducts. As Pe R Rdso Specification No. Rdso/Pe/Spec/Ac/0061-2005 (Rev-1) , Type-I & Microprocessor To Rdso/Pe/ Spec/Ac/0139-2009 (Rev-1) Complete With Accessories As Per Scope Of Supply As Envisaged In The Rd So Specification Along With Modification Sheet No. Rdso/Pe/Ms/Ac/0077-2018 (Rev 0) And Rdso/Pe/M S/Ac/0089-2022 (Rev-0). Packing Instruction: Pi026. Note: 01 Set Consists Of 02 Rmpu Units. [ Warran Ty Period: 30 Months After The Date Of Delivery ] ]