Construction Of Cc Approach Road Of Length 200 Meters From Main Road To Swayambu Sri Durga Malleshwara Swamy Temple At Mustibanda And Gravel Road From Oil Palm Factory To The R And B Road At Apparaopet.(V),Dammapeta(M),Bhadradri Kothagudem(D),Telangana State