Mobilization And Demolization Charge Of Men And Mechineryat Site Complete All As Specified And Directed , Shifiting Ofmachinery From One Point To Another Complete All Asspecifed And Directed , Boring Through Soil Drilling Of Boreholes Of 150Mm Dia By Shell And Auger With Ms Casing Asper Is 189219792002 , Conducting Test On Disturbed Andundisturbed Samples Collected To Find Out The Shearparametersgiven In The Soil Report , Submitting 6 Copies Ofcomplete Report Consisting Of Each And Every Details Oflocations Quantity: 16