Surface Excavation N.Exc Not Exceeding 30 Cm Deep Andaeraging 15Cm Deep An Getting Out In Soft-Loose Soil ,Removing Excavated Soil N.Exc 50M Depositing Wheredirected At A Level N Exc. 1.5 M Above The Starting Point ,Providing And Laying At Or Near Ground Level Factory Madekerb Stone Of M-25 Grade Cement Concrete In Position To Therequired Line, , Supply And Laying Machine Pressed Precastconcrete Interlocking Paver Block Perforated Design To Allowvegetation Growth , Supply And Fixing Ss-304 Grade Stanlesssteel Outdoor Bench Without Back Rest, Made Out Of Sssqaure Pipe, Quantity: 237