Providing Temporary Cross Bund With Sand Bags Across The River Bank For Stagnation Of Water In Gosthani River At Boni Head Water Works In The Time Of Releasing Water From Thatipudi Reservoir Under Ae-24 Section Before Summer Period - 2026