Repairs To 100 Mt Capacity Hoist Of Vertical Lift Gate No.6,11,15 By Means Of Manufacturing, Machining And Fitting Of First And Second Pinion Shaft Of Right Hand Side And First Pinion Shaft(Left Hand Side) Of Gate No.11, First And Second Pinion Shaft Of Right Hand Side Of Gate No.6, Third Pinion Shaft Of Right Hand Side Of Gate No.15 With Pedestals, Muff Coupling Also Dismantling And Fitting Gear And Pinion To Shaft, Emergency Shifting Of First And Second Pinion Shaft Of Left Hand Side And First Pinion Shaft Of Right Hand Side Of 100 Mt Hoist Of Gate No.2 To Hoist Of Gate No.1 And Shifting Of First And Second Pinion Shaft Of Right Hand Side Of Gate No.10 To Gate No.11, Fabrication And Erection Of Foundation Chair Having Plate Thickness 20Mm For Pedestal Bearing Housing Of First Pinion Shaft Of Gate No.11 At Vishnupuri Barrage Dist-Nanded.