Work For Fabrication & Erection Of Walkway To Connect Gravimetric Feeder Floors At Elevation At 20 Meter With Span At 35 Meter By M.S. Platforms, Supports, Railings, Grills And Toe-Guard Etc. With Providing Epoxy Paint At Boiler Of Unit No. 3 & 4 At Sikka Tps.