Reconstruction Of Power Grids 10-0.4 Kv L-1, L-2 From Ktp-491-04 With The Installation Of An Unloading Transformer Substation In The Village Of Hills Of The Lviv District Of The Lviv Region (Second Time) (Investment Program Of Pjsc "Lvivoblenergo" For 2026, Section 1, Point 1.2.3.2.15)