Renovation Of Existing L(One) No Vertical Bore Hole At 531/ Inbetween 2(N) &3(N) In Dobrana (R-V) Seam Of Belbaid Colliery Which Has Been Used For Dewatering Of Underground Water Outside The Mineto The Surface.