Occasional Repair Of Wall Finishes In The Villa Area (Total Surface Area +- 630M2). Painting Of Historic Walls And Ceilings (+- 180M2). Q3 Finishes, Installation Of Vlies And Paintings On Walls And Ceilings In The Nursery Area (+- 1,370M2). Painting On Concrete Block Walls In The Annex (+- 85 M2). Epoxy Floor Painting In The Annex (+- 30 M2). Restoration/Painting Of Historic Metal Guardrails (+- 6M2).