Design and survey work on the object: "Overhaul of the section of the gas pipeline-branch to the Vinnytsia Pivnichna GDS Du 500 at km. 42 in the Khmilnytsia district of the Vinnytsia region" (Stages "Project" and "Working documentation") (Construction works and current repairs)