Picking Of Shale, Stone, Oversize Coal And Foreign Material From The Coal On Running Conveyor Belts Running At The Speed Of Around 3.50 Meters Per Second Pertaining To General/Chp/Sdstps For The Period Of 6 Months During The Year 2026-27.