Reinforced Concrete Frame Structure With Cyclopean Stone Stabilization Walls. Scope Of The Work: Earthworks In Excavation And Embankment 1,000 M3; Temporary Diversion Of The Watercourse, Demolition Of The Existing Structure 130M3, Reinforced Concrete Work 38 M3, Reinforcement 5700 Kg, Waterproofing 120 M², Cyclopean Stone Retaining Walls 45M3, Bituminous Coating 9.5 To.