Creos Luxembourg S.A. Intends To Carry Out The Undergrounding Of High-Voltage Lines Between The Future Creos Substation In Bofferdange And The Creos Substation In Senningerberg On The One Hand And On The Other Hand, Create An Additional Link To The Creos Substation In Kirchberg. The Laying Of Medium Voltage Lines Is Also Planned To Connect The Mv Network To The Future Bofferdange Substation. The Selected Route Is Located In The Territories Of The Municipalities Of Niederanven, Steinsel And Lorentzweiler, It Is Divided Into Two Parts As Follows: -Senningerberg - Bofferdange Link: 3 Hv Systems Over An Approximate Length Of 7 Km, Part Of Which Also Has 2 Mv Systems Over Approximately 900M On The Bofferdange Side. -Section Towards Kirchberg: 1 Ht System Over An Approximate Length Of 1 Km.