Study And Technical Monitoring Of The Execution Of The Works Development Of Five Tracks: - The Track Linking Rp 2009 To Douar Bab Zergua Over A Length Of 2 Km - The Track Linking Douar Dar Alain And The Track Leading To The Souika Of Tamesloht Over A Length Of 1.4 Km - The Track Linking Douar Ain Maazouza And Tamesloht Center Over A Length Of 1.4 Km - The Track Linking Zaraba To Douar Benomar (Study Adaptation) Over A Length Of 1.2Km - The Track Connecting Dr Laataona And Zaraba Over A Length Of 2Km