The Object Of The Contract Is The Execution Of The Conservation Works Of The Pneumatic Msw Collection System In The El Toyo I Urbanization, Due To The Detection Of Pressure Losses In The Buried Pipe Network, Caused By Poorly Closed Manholes, Waste Valves And Sectioning In Poor Condition Due To Wear And Tear From The Service And Corrosion Of The Environment.