(1)Bridge No.520/1- Replacement Of Psc Girders, (2) Bridge No.527/1- Replacement Of Psc Slabs, Construction Of Walls, (3) Construction Of Bridges At Ch 214075 (Aqueduct), Ch 214217 (Syphon), Ch 215750 (Hydraulic) And Ch.225475 (Rub),(4)Construction Of Balance Work Of Tower Wagon Shed At Amalner,Beed,Wadwani And Sirsala, (5)Catch Water Drain, Drain In Cutting, Load Testing Of Major Bridges,Flooring At Station Platforms, (6)Beed Yard Earthwork And Platform Wall, Rub Outlet Drain Wall A