Treatment Of Hidden Safety Hazards On The Roof Of The Sintering Area Of ​​The Third Baiyin Nonferrous Smelting Plant, And Tender Announcement For The Replacement Of The Color Steel Tiles On The Walls And Ceiling Of The Color Steel Room On The Fourth Floor Of The Smelting Workshop And Waste Heat Boiler