Dismantling Of Existing Log-Boom At Uri Barrage And Detailed Revised Design, Engineering, Fabrication, Supply, Erection, Testing And Commissioning/Launching Of Novel Synthetic Floating Log-Boom Barrier Trash Screen In The Reservoir At The Barrage.