Supply, Installation, And Commissioning Of Dual Miner Pad Compensating Arrangement, Oper Ating With Hp Pavilion 13-Bb0078Tu As Per Specification Attached At Annexure-A At Crw/Mancheswar. [ W Arranty Period: 30 Months After The Date Of Delivery ] ]