Construction Of 45 Nos Of 125Mm Dia X 48M Deep Gravel Packed Tube Well With I.M-Ii Hand Pump With Constrcution Of 1.85Mtrn Dia. Circular P.C.C (1:2:4) Platform And P.C.C (1:2:4) Drain As Per Unicef Design Including 1M Dia And 2M Deep Soakpit Under P.H.Division, Hilsa , District- Nalanda For The Year Of 2025-26.