Under Frame Complete For Lhb Scn (Eog) Coaches Note:-(1)Crf Items Are To Be Manufactured As Per Dy. Cple-Iii Letter No. Rcf/Hsq/Plg/Mpsh/510003/Lhb Dated 04/04/2024. (2) P Rotection Procedure As Per Dy Cple-Iii Annexure-App Dated 14/05/2024. Note-(3).Mounting A Rrangement On Underframe For Biological Tank As Per Drg No. Le11442 Alt ' F '., As Per Dra Wing: Ls11196 Alt'G' & As Per Schedule Of Technical As Per Specfication No. Mdts21320 Rev -02 Dated 09.06.2020 02 & Masking As Per Drg. No. Mi007679 Alt.'Nil' Note: 1. Supporting Me Mber On Trough Floor To Drg.No. 'Ls10206 Alt'F', Packing Instruction: Pi042 Ver 3.0. [ Warrant Y Period: 84 Months After The Date Of Delivery ] ]