Bogie Frame To Drg. No. (A) Icf/Mrvc/D-0-3-001, Alt "N", Col-Ii (Or) (B) Icf/Mrvc/D/Bt-0-3-001, Alt "C", Col -Ii Along With Damper Fixing Bracket To Drg. No. (339)Ac/Dcemu/D6-0-1-602,Col.I - 4 Nos And Bolt Complete To Drg. No. Emu/M/3Ph-0-2-002, Alt "C", Col.I - 16 Sets Bogie Frame To Be Supplied Withou T Nylon Bushes Where Ever Applicable And Shall Confirm To Rdso/Specn.C-9202, Rev-2 Or Latest. The Fi Rm Shall Fulfil The Requiremnt As Per Icf/Md/Specn/147, Issue Status 01, Rev-02 With Amendment No- 0 2. Special Condition : - Suppliers Commitment Will Be There To Supply As Per Drawing -(A) ( For Dash Pot Arrangement ) Or As Per New Drawing - (B) ( For Adoption Of Conical Spring ). - One Month Notice Will Be Given To Vendor Whether He Has To Supply As Per Drawing - (A) Or Drawing - (B). -Rate Quoted Will Be Applicable To Both Drawing - (A) And Drawing - (B) . I) Paint Scheme Shall Be As Per Drawing. Ii) Qap To Format Icf/Ims/Md/F-31 Shall Be Prepared Along With Relevant Documents And Kept Ready For Dev Elopmental/Educational Order. Iii)Firm Should Supply Bogie Frame Along With The Dimensional Repor T, Stress Relieving Report And Radiography Films. Iv) Firm Should Have Induction/Electric Furnace F Or Stress Relieving Of Bogie Frame. V) Prototype Inspection Is Applicable Only For First Time Of Devel Opmental/Educational Order. Vi) Stage Inspection To Be Done As Below. (A) Raw Material Stage 1. Ensure The Raw Material Used Using Portable Spectrometer Machining Stage 1. Dimensional Checks 2. Edge Preparations (B) Welding Stage 1. Weld Parameter To Be Checked And Recorded. (C) Surface Preparation And Painting Stage. 1. Short/ Sand Blast To The Requirements. 2. Painting Process As Per The Specification. 3. Final Product Inspection. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lac S ] ]