Supply And Erection Of 15 Feet Gi Pipe Of 100 Mm Dia 4.5M Thickness Of Medium Quality Isi N O: 1230(Part 1) 1990. Having An Iron Base Plate 10 Mm Thick X 30 Cmx 30Cm Welded At The Bottom Of The Pi Pe With Four Supports Of Iron Bars Of Sizes 10 Mm Dia. The 3 Feet Pipe Shall Be Buried In The Ground And 12 F Eet Shall Be. Above The Ground. The Work Includes Digging Of The Pit On Platform, Laying Of Cable In Between Poles In Suitable Underground Gl Pipes, Erection Of Pole And Filling The Pit With 1:3:4 Cement, Concrete And S And. Final Plastering Should Be Done On The Surface. The Iron Bracket On The Top Of The Pole Shall Be Provide D To Fix The Cctv Camera, Protection Cover And Junction Box. The Work Includes Supply Of All The Materials R Equired In This Item. [ Warranty Period: 30 Months After The Date Of Delivery ] ]