Lwsczac Shell Kit 534 A One Coach Set Of Roof, Sidewall And End Wall For L Wsczac 534 1. Roof Assembly To Drg No 53416001, Alt 'C' - 1 No, 2. Final Roof Element Cpl T O Drg No. 87716014, Alt 'E' - 2 Nos. 3. Final Roof Element Cpl To Drgno. 87716015, Alt 'E' - 2 No S. 3. Side Wall To Drg No. 53414001, Alt 'D' - 1 No. 4. Endwall To Drg No 59315007, Alt 'B' - 2 N Os. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Spec-200, Issue Status-01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md /Spec-315, Issue Status-01,Rev.00, With Amendment No 01. B One Coach Set Of Welding Par Ts On Body Shell And Partition Frames For Lwsczac Coaches To Drg. No. 1. (Lwsczac) 534 10002, Alt 'B' - 1 No. 2. (Lwsczac) 53410054, Alt 'L' - 1 No. 3. 58110016, Alt 'A' - 6 Nos. 4. 58110 015, Alt 'A' - 3 Nos. 5. Aaa10972, Alt 'A' - 3 Nos. 6. Aaa10976, Alt 'Nil' - 1 No. 7. Aaa10977, Alt 'N Il' - 1 No. 8. Aaa10978, Alt 'Nil' - 1 No. 9. Aaa10979, Alt 'Nil' - 1 No. 10. Aab10007, Alt 'A' - 4 Nos. 11. Aaa10963, Alt 'Nil' - 2 Nos. 12. Ssa10018, Alt 'Nil' - 3 Nos. 13. Aaa10967, Alt 'Nil' - 1 No. 14. S Sa10021, Alt 'Nil' - 2 Nos. 15. 58110017, Alt 'C' - 2 Nos. 16. Aaa10970, Alt 'Nil' - 4 Nos. 17. Aaf10 937, Alt 'Nil' - 3 Nos. 18. (Lwsczac)53410001, Item.25, Alt 'R' - 12 Nos. 19. Aab10014, Alt 'Nil' - 4 Nos. C Under Frame Arrangement To Drg No. 85111001 Col 1. Alt 'P' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Spec-147, Issue Status 01 Rev.02 With Amendmen T No.02. Special Condition : Packing As Per Icf/J&T/Misc-2201, Alt 'E'. Packing As Per Icf/J&T/Sk- 1809, Alt 'A'. Packing Condition As Per Drg.No.Icf/J&T/Misc-2487, Alt 'B' The Underframe Sh Ould Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf /J&T/Sk-1865, Alt 'A'. (A) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrome Ter (B) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (C) Trestle Stage # Marking, Drilling & Tapping Of Holes Wh Erever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # We Ld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Vis Ual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (D) Surface Preparation And Paintin G Stage. # Short/Sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual I Nspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts- 28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floo R With Cross Members To Avoid Bi-Metallic Corrossion. [Safety Item] [ Warranty Period: 30 Months A Fter The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permit Ed: Max 8 Lacs ] ]