One Coach Set Of End Part For Air Conditioned Emu Trailer Coaches To Drg. Nos. Emu/C/Ac-1-1-002, Col-Iii, Alt 'D' -1 No, Emu/C/Ac-1-1-003, Col-I, Alt 'C' -1 No. Special Condit Ion : Special Condition: I) The Manufacturing Facility Requirement As Per Icf/Md/Spec-147, Issue Status-01,Rev-02, Amendment No.02. Ii) Body Bolster To Drg.No.Icf/Mrvc/C/Ss-1-1-005, Alt 'H', Col.I To Be Provided Without A)Side Bearers To Drg.No.Emu/M-1-1-027,Alt 'Z' Col-Ii. B)Grubscrews To Drg.No.Icf/Mrvc/C/Ss-1-1-005, Alt 'H' Item-8, And C)Side Bearer Covers To Drg.No.Emu/M-1-1-027, Alt 'Z' Item-1. Iii)The Under Frame End Part Should Be Supplied With Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (A) Raw Material S Tage # Ensure The Raw Material Used Using Portable Spectrometer (B) Jig Stage # Assembly Of Sole Bar With Cross Members. # Assembly Of Body Bolster Arrangement. # Welding Of Ribs With Sole Bar. # Placing & Welding Of Top Sheet Arrangement. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (C) Surface Preparation And Painting Stage. # Short/Sand Blast To The R Equirements. # Painting Process As Per The Specification. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members S Hall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-Metallic Corrosion. Sui Table Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Preven Tion During Storage. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]