Under Frame Complete For Lhb Gs(Eog) Coaches Note:-(1) Protection Procedu Re As Per Dy Cple-Iii Annexure-App Dated 14/05/2024. Note-(2).Mounting Arrangement On Un Derframe For Biological Tank As Per Drg No. Le11442 Alt ' F '., As Per Drawing: Lg11265 Alt'J' & As Per Schedule Of Technical Requirement Specification No. Mdts21320 Rev-02 Dated 09 .06.2020 & Masking As Per Drg. No. Mi007679 Alt.'Nil' Note: 1. Supporting Member On Troug H Floor Will Be Applicable As Per Drg.No. Mi006839 Alt'D'., Packing Instruction: Pi042. [ Warranty Period: 84 Months After The Date Of Delivery ] ]