For The Provision Of Dry Dock Maintenance For Four Harbour Tug, Three Pilot Boats, Two Workboats, And Two Launches For Transnet National Ports Authority (Tnpa), Port Of Cape Town On An As And When Required Basis For A Period Of Thirty-Six (36) Months