The Object Of The Contract Consists Of The Supply, Transport, Assembly And Installation Of Cardiovascular Fitness And Bodybuilding Equipment For The Gym Located In The Reus Municipal Olympic Pavilion (Pom), With The Aim Of Renovating And Modernizing Part Of The Existing Machinery. The Contract Includes The Supply Of Machines And Equipment With The Minimum Mandatory Technical Characteristics That Will Be Established In The Technical Specifications. The Contract Includes The Supply Of Machines And Equipment With The Minimum Mandatory Technical Characteristics That Will Be Established In The Technical Specifications.