Preparation Of Separate Design And Cost Documentation For Packages: 1) Package I - Iw 2122: Liquidation Of The Group Station At Ul. Unruga 70A In Gdynia. Change In The Method Of Power Supply To 4 Buildings - Construction Of Four High-Parameter Heating Connections To Buildings: Unruga 70, Unruga 72, Unruga 74, Rymarska 42, Along With Obtaining A Certificate Of No Grounds To Object To The Construction In Question; 2) Package Ii - Iw 2145: Construction/Reconstruction Of A High-Parameter Section Of The Heating Network Connection 2Xdn150 From The K112 Heating Chamber, Located In The Area Of ​​​​The Building At Ul. Jana Z Kolna 36 To Chamber K-111, Located Near The Building At Ul. Plac Konstytucji 2 In Gdynia, Along With Obtaining A Certificate Of No Grounds To Object To The Construction In Question, Along With Possible Author'S Supervision - 1302045