1)Illumination Works In Connection With Construction Of Lhs (Limited Height Subway) On Up Line At Km 183/24-25 Between Suku - Koraput Stations Under The Jurisdiction Of Aden/Krpu On Kk Line Of Waltair Division ..2) Illumination Works In Connection With Proposed Construction Of Limited Height Subways (Lhs) (I) At Km. 243/20-22 In Lieu Of Lc No. Kk-55 At Km. 243/22-24 Between Dhanapur And Khadapa Stations And (Ii) At Km. 273/10-12 In Lieu Of Lc No. Kk-71 At Km. 273/18-20 Between