Rehabilitation Work On The Robert Blezel Room In Templemars The Work Following An Infiltration Disaster, The Services Listed In The Dce Include A Part Which Will Concern The Removal Of Existing Installations Within The Limits Described In This Document As Well As On The Indications Identified In The Architect'S Plans, And A Second Part Concerning New Work And The Restoration Of Existing Preserved Structures. 5 Lots: Lot 1: Roofing Work, Lot 2: Photovoltaic Work, Lot 3: Plastering Work –– Paintings, Lot 4: Interior Carpentry Work, Lot 5: Electrical Work