Provision, Commissioning And Testing Of Existing Igbt-Based Three-Phase Propulsion (Medha) Non- Ac Motor Coach For Conversion Into Ac-Enabled Coach, Including Mounting And Installation Of Rmpus, Supply And Fitment Of Stainless-Steel Trough Assembly Below Rmpus, Air-Distribution Ducting, And Drain-Water Pipe Arrangem Ent To Ensure Zero Leakage Into Passenger Area, As Per Enclosed Specification/Annexure. Note: Rmpus, Control Pa Nel, And Necessary Roof-Wiring Cables Will Be Supplied By Railways. Prior Approval Of Coach Ga Drawings For Rewiri Ng And Modification Shall Be Obtained Before Commencement Of Work. [ Warranty Period: 30 Months After The Date Of Delivery ] ]