ROCK CLEARANCE WORK AFTER THE USE OF EXPLOSIVES INCLUDING SLOPE FORMING BY ROCK BREAKER, LOADING, TRANSPORT AND STOCKPILLING OF MATERIALS OVER A DISTANCE OF (05) KM, DIVIDED INTO THREE (03) LOTS, FOR THE PROJECT CONSTRUCTION OF THE SINGLE-TRACK RAILWAY LINE BECHAR-TOUMIAT.