Dismantling And Re-laying Work Of Inhaul Line No.10 Of Trippler 04 And Outhaul Line No.14 Of Trippler 01 Along With The Concreting Work In Inhaul Of Line No.10 Of Wagon Trippler 04 In Coal Handling Plant B Thermal Power Station Of Otps,obra (EXPIRED)